fbpx

Siberian Larch Tongue and Groove Shiplap

Siberian Larch Tongue and Groove Shiplap

Share on facebook
Share on google
Share on twitter
Share on linkedin

£168.75£1,865.45

Including VAT and Delivery

Quick and easy to install – no specialist tools required, very little work required to finish onsite, annular ring shank stainless steel nails appx 50mm long or stainless-steel screws, predrilling is recommended for fixing.
Can clad both horizontally and vertically.
Closed board construction protects structures from the elements.

Clear

Delivered in 10-14 working days nationwide

Product Description

Quick and easy to install – no specialist tools required, very little work required to finish onsite, annular ring shank stainless steel nails appx 50mm long or stainless-steel screws, predrilling is recommended for fixing.

Can clad both horizontally and vertically.

Closed board construction protects structures from the elements.

This item is delivered direct to you from one of our suppliers, please see our Terms & Conditions for more details.

  • Natural durable timber no chemicals added Hardwood Cladding Properties
  • Can be used to clad vertical or horizontal
  • Quick and easy to install supplied in long lengths
  • Timber from Sustainable Sources and FSC Certified

Additional Information

Dimensions 19 × 145 mm
Packages

,

Profiles

Tongue and Groove

Lengths

Coverage

1m2 = 8 linear mtrs

Available in more colours

2 (Chilli Rosewood and Sand Oak)

Fixings

2 Annular Ring Stainless Steel Nails minimum 50mm long or Screws minimum 30mm long for 22mm thick or less cladding

Working Properties

Easy to work

Pricing

Length Linear Metre Square Metre
4m £3.59 £28.72

Profiles & Downloads

Technical Information

Profile           : 39134146
Type              : External Cladding
Nom size      : 19 x 145

Reviews

There are no reviews yet.

Be the first to review “Siberian Larch Tongue and Groove Shiplap”

Your email address will not be published. Required fields are marked *

Due to increased workload, we are experiencing some delays which may lead to longer lead-times of 15 to 20 working days.